Even on the first of May (Labour Day) our workgroup members are hardworking. After we got the permission to use our old lab (F-015) in addition to F-031, we had green light for some modifications. For quite some time we were planning to setup at least half of a good playing field because our old one was inclined and as such not really usable anymore.
Thus began the planning and alteration of the rooms at 10 o’clock. It was a lot of screwing, carrying and installing. As a reward we got two newly arranged rooms in which everyone has a lot of space for working.
The evening was then used to do some tests on the new playing field and to prepare for the ucoming Kirchentag.